Sears Point Restoration Project

Sonoma Land Trust, Coastal Conservancy, & many partners

Project Description

Slated for casino development, the 2,327-acre Sears Point property was acquired by Sonoma Land Trust in 2004. Diked and drained for over 120 years, the area had subsided 6 feet and was vulnerable to catastrophic flooding.

In 2015, the Sonoma Land Trust and Ducks Unlimited breached the levee at two locations, reuniting tidal flow to 960 acres of the site, restoring critical habitat for wildlife, and incorporating resilient features in the restoration design to help the site adapt to sea level rise.

Marsh mounds were constructed to reduce wind-wave energy and slow water flows to allow deposition of sediment that will elevate the marsh as sea levels rise. In addition, a sloped levee protects Highway 37, railroad tracks, and farmland from flooding, while providing transitional habitat for wildlife and refuge during storm events.

Marsh Mounds Objectives

  • Reduce wind fetch, dampen associated wave-energy, and provide topographic relief in an otherwise flat, open tidal basin.
  • Maximize sediment deposition to help raise the marsh from subsidence. Tides bring in water-borne sediment and marsh mounds slow water to help drop sediment and raise elevation over time.
  • Create channels over time to restore hydraulic and ecological functions.
  • Provide high tide refugia for wildlife. Mounds were not designed for this purpose at Sears Point, but other restoration project designs plan for this service, such as the Audubon California’s Sonoma Creek Project.

Design

  • 500 marsh mounds were constructed using sediment excavated from channels created before the site was breached.
  • Mounds were built to have 7:1 slopes and up to 70-foot diameter with a top elevation of the 6.5-foot, between mean seal level (MSL) and mean higher high water (MHHW).
  • Mounds were sited in front of the levee to protect it as well as at randomly distributed locations throughout the site.

Construction

  • Much of the construction was relatively easy because the dry farmland the project site consisted of allowed contractors to drive on the fields, although high groundwater in some areas caused challenges for equipment.

Monitoring

  • Monitoring of water quality, sedimentation, erosion, vegetative cover, and wildlife use will continue for 15 years (funding-dependent) and adaptive management measures are built in if objectives are not met. In addition, US Army Corps of Engineers is monitoring wave energy at two restoration sites, with and without marsh mounds.

Reduction of costs and risk

Like much of the north bay shoreline, the diking and subsidence of the Sears Point project area prevented seasonal rains from draining naturally into the bay. At a large annual expense, drainage ditches and pumping stations are maintained and operated on subsided lands to keep fields dry and prevent flooding of Highway 37 and railroad.

Costs: $18 million, 90% going to the tidal portions of the project and 10% to the upland portion

Timeline: Preliminary restoration plan, 2007; implementation, summer 2013; breach, 2015; Bay Trail open, 2016

Permitting: Two years needed to acquire permits as expected. A key to success was early establishment of good relationships with stakeholders such as the railroad, PG&E, and hunting clubs.

Partners: Sonoma Land Trust, Ducks Unlimited, US EPA, Federal Highway Administration, US Fish and Wildlife Service, NOAA, San Pablo Bay National Wildlife Refuge, Wildlife Conservation Board, Coastal Conservancy, CA Dept. of Water Resources, CA Dept. of Fish and Wildlife, Sonoma County Agricultural Preservation and Open Space District, Association of Bay Area Governments, Moore Foundation, Federated Indians of the Graton Racheria, Natioanl Fish and Wildlife Foundation, SF Bay Joint Venture

For more information: www.sonomalandtrust.org or contact Julian Meisler, Sonoma Land Trust (julian@sonomalandtrust.org; 707-526-6930)

Marsh Mounds at Other Locations: Sonoma Creek Enhancement Project (Audubon California)

  • 20 mounds (25 ft wide by 50-100 ft long) were constructed from freshly excavated soil from the project’s dredged channel.
  • Two acres of high marsh fill was permitted for the marsh mounds and project design limited them to 8.4 feet tall so as not to convert tidal marsh to upland habitat.
  • Mounds were expected to shrink 30% as waters drained from the soil, but measured rates were 50-60% due to exposure to sun/air and winter storm events.
  • Marsh mounds were covered with pickleweed mats scraped from the channel footprint to expedite reveg

Photo credits: Stephen Joseph, Corby Hines, Sonoma Land Trust, Audubon California

Back to Natural Infrastructure

Latest News

  • California Sea Otter Fund: Grant Applications Due September 7, 2018
    The State Coastal Conservancy is now accepting applications for its 2019 Sea Otter Recovery Grants. The grants will be funded with monies from the California Sea Otter Fund, which is one of the state’s voluntary tax check-off funds that allows taxpayers to contribute additional money for use towards the recovery of California sea otter populations. […] (Read more on California Sea Otter...)
  • Job Posting: Accountant Trainee
    For more information and to apply, please visit: https://www.jobs.ca.gov/CalHrPublic/Jobs/JobPosting.aspx?JobControlId=115547 The position is located in Oakland, CA. Applications received without ALL the required items, will NOT receive further consideration for this position.  A copy of your transcripts or diploma is required, if you are on the Accountant Trainee list.  To take the Accountant Trainee exam, click this link:  https://www.jobs.ca.gov/JOBSGEN/9PB31.PDF Under […] (Read more on Job Posting: Accountant...)
  • Job Posting: Staff Counsel
    The Coastal Conservancy is hiring an attorney to serve as staff counsel. Apply on the Cal Careers website here: https://www.jobs.ca.gov/CalHrPublic/Jobs/JobPosting.aspx?JobControlId=111240 The position is located in Oakland, CA. Once a significant candidate pool is received, an internal cutoff period will be established, and only the most qualified candidates will be invited to the interview. Please read the […] (Read more on Job Posting: Staff...)
Coastal Conservancy on FaceBook Coastal Conservancy on Twitter Coastal Conservancy on Instagram Coastal Conservancy Email List Sign up and Stay Informed!
SCC/OPC Project Viewer
Help Save Sea Otters at Tax Time Help Save Sea Otters at Tax Time